You pay one fixed amount every month. This way, you won't face unexpected costs.
We deliver and install your dryer for free. If it breaks, we will repair or replace it within 2 working days. That is also free.
After the first year, you can cancel your subscription for free every month.
20,99
per monthYou are renting a high-quality, energy-efficient product. When ordering, you pay a one-time fee. After that, we automatically deduct a fixed amount from your account every month. The product always remains the property of Coolblue. You do not pay it off.
No, with a subscription, you rent the device from us. It remains the property of Coolblue.
Yes, that is possible via our customer service. However, there may be additional costs involved.
Product number | 969803 | |
|---|---|---|
Manufacturer code | 859991719940 | |
Brand | Whirlpool | |
Processing of your defect | At your home | |
Old product returned for free |
Type of dryer | Heat pump dryer | |
|---|---|---|
Condensation drain | Collection in reservoir, Via drain | |
Maximum load capacity, drying | 8 kg | |
Maximum noise level | 60 dB | |
Cycle duration cotton full load | 174 min | |
Cycle duration, cotton, partial load | 108 min | |
Speed class | Fast | |
Number of programs | 15 | |
Dryer cycles | Bedding, Blankets, Cotton, Cupboard dry, Delicate, Dress shirts, Eco, Extra dry, Iron dry, Mixed, Refresh, Short, Small load, Sportswear, Synthetic, Towels, Wool | |
Clean lint trap indicator | ||
Empty condenser reservoir indicator | ||
Optional condensation water drainage | ||
Condensation drain hose included | ||
Laundry-care drum | ||
Drum lighting | ||
Drum rotation direction | Variable | |
Steam function | ||
Humidity sensor |
User-friendliness | Anti-wrinkle phase, Auto shut-off, Child safety lock, Controls via app, Drum lighting, Laundry-care drum, Self-cleaning condenser, Start delay, Steam function, Time remaining indicator | |
|---|---|---|
Touchscreen | ||
Display | ||
Control panel language | Dutch, French | |
Start delay | ||
End of cycle signal | ||
End of cycle signal type | Acoustic, Optical | |
Accessibility options | Audio signals | |
Time remaining indicator | ||
Anti-wrinkle phase | ||
Maximum crease guard time | 30 min | |
Child safety lock | ||
Fragrance system | ||
Brand-specific functions | Whirlpool 6th SENSE |
Energy label | B | |
|---|---|---|
Auto shut-off | ||
Energy-saving over lifespan | 280 euros | |
Energy consumption cotton cupboard dry | 1,28 kWh | |
Annual energy consumption | 157,8 kWh | |
Annual energy costs | 47,34 euros |
Build quality | Basic | |
|---|---|---|
Condensation efficiency | 12 % | |
Drum material | Stainless steel | |
Self-cleaning condenser | ||
Anti-vibration walls | ||
Casing material | Metal | |
Brushless motor | ||
Cleaning indicators | Condenser, Lint trap | |
Material hinge | High-quality plastic |
Height | 84,6 cm | |
|---|---|---|
Width | 59,8 cm | |
Depth | 67,4 cm | |
Weight | 46 kg | |
Opening diameter | 32 cm | |
Glass door | ||
Standard door direction | Right | |
Reversible door | ||
Color | White |
Power supply type | Power grid | |
|---|---|---|
Cable length | 1,5 m | |
Minimum power supply | 800 W |
Controls via app | ||
|---|---|---|
Controlled via Android app | ||
Controlled via Apple app | ||
Controlled via Windows app | ||
Compatible with smartphone / apps | ||
Suitable for Free Drying | Yes |
It's much quieter than my old one. I still need to figure out how and what's possible, but it's all fine. It's a shame about the manual; it's difficult to read on a cell phone, plus there are a few pages in Finnish. Luckily, my mom was able to print them out.
Godelieve
28 November 2025
Automatically translated from Nederlands
I had to buy a new one too soon after buying a previous machine. Hopefully, this one will last longer. Time will tell.
Karolina 64
11 February 2026
Automatically translated from Nederlands
Very happy with it so far; super quiet and fast, yet with a good result.
M vd Velden
27 April 2026
Automatically translated from Nederlands
Type of dryer | Heat pump dryer | |
|---|---|---|
Maximum load capacity, drying | 8 kg | |
Energy label | B | |
Energy-saving over lifespan | 280 euros | |
Maximum noise level | 60 dB | |
Self-cleaning condenser | ||
Depth | 67,4 cm |
According to our dryer expert
With the Iron Touch program, you can reduce wrinkles with steam.
Save up to € 280 on energy costs over the product's lifespan thanks to the B energy label.
With a noise level of 60 decibels, you can dry much more quietly than average, so you'll notice as little noise as possible.
Emits 12% moisture, so it's less suitable for a small, unventilated room.
The included drain hose is relatively short at 1.2m, so buy a longer hose if it doesn't reach the drain.
20,99
per month20,99
per monthSold out
Sold out