Delivered to just over the doorstep of your home
Do you live in an apartment building and don't have an elevator? We deliver up to the 4th floor. We'll place the device just across the doorstep of your house.
Take old product with us
We'll take your old appliance with us for free, if it's ready at the front door.
Product number | 985519 | |
|---|---|---|
Manufacturer code | 859993358670 | |
Brand | Whirlpool | |
Processing of your defect | At your home | |
Old product returned for free |
Type of dryer | Heat pump dryer | |
|---|---|---|
Condensation drain | Collection in reservoir, Via drain | |
Maximum load capacity, drying | 9 kg | |
Maximum noise level | 64 dB | |
Cycle duration cotton full load | 195 min | |
Cycle duration, cotton, partial load | 120 min | |
Speed class | Fast | |
Number of programs | 15 | |
Dryer cycles | Baby clothes, Bedding, Blankets, Cotton, Cupboard dry, Dress shirts, Eco, Extra dry, Iron dry, Jeans, Lingerie, Mixed, Refresh, Short, Small load, Sportswear, Synthetic, Towels, Wool | |
Clean lint trap indicator | ||
Empty condenser reservoir indicator | ||
Optional condensation water drainage | ||
Condensation drain hose included | ||
Laundry-care drum | ||
Drum lighting | ||
Drum rotation direction | Variable | |
Steam function | ||
Humidity sensor |
Touchscreen | ||
|---|---|---|
Display | ||
Control panel language | Dutch, French | |
Start delay | ||
End of cycle signal | ||
End of cycle signal type | Acoustic, Optical | |
Accessibility options | Audio signals, Clickable dial | |
Time remaining indicator | ||
Anti-wrinkle phase | ||
Maximum crease guard time | 120 min | |
Child safety lock | ||
Fragrance system | ||
Brand-specific functions | Whirlpool 6th SENSE, Whirlpool AdaptiveDry, Whirlpool PrecisionDry, Whirlpool SilentSpin |
Energy label | C | |
|---|---|---|
Auto shut-off | ||
Energy-saving over lifespan | 200 euros | |
Energy consumption cotton cupboard dry | 1,1 kWh | |
Annual energy consumption | 110 kWh | |
Annual energy costs | 33 euros |
Build quality | Basic | |
|---|---|---|
Condensation efficiency | 12 % | |
Drum material | Stainless steel | |
Self-cleaning condenser | ||
Anti-vibration walls | ||
Casing material | Metal | |
Brushless motor | ||
Cleaning indicators | Condenser, Lint trap | |
Material hinge | High-quality plastic |
Height | 84,6 cm | |
|---|---|---|
Width | 59,8 cm | |
Depth | 67,4 cm | |
Weight | 46 kg | |
Opening diameter | 32 cm | |
Glass door | ||
Standard door direction | Right | |
Reversible door | ||
Color | White |
Power supply type | Power grid | |
|---|---|---|
Cable length | 1,5 m | |
Minimum power supply | 900 W |
Controls via app | ||
|---|---|---|
Controlled via Android app | ||
Controlled via Apple app | ||
Controlled via Windows app | ||
Compatible with smartphone / apps | ||
Smart home platform | Amazon Alexa, Apple HomeKit |
Type of dryer | Heat pump dryer | |
|---|---|---|
Maximum load capacity, drying | 9 kg | |
Energy label | C | |
Energy-saving over lifespan | 200 euros | |
Maximum noise level | 64 dB | |
Self-cleaning condenser | ||
Depth | 67,4 cm |
9 kg
9 kg
8 kg
10 kg
C
A
C
A
200 euros
340 euros
200 euros
340 euros
According to our dryer expert
With a 9kg load capacity, you can dry larger loads of bedding or clothing in one go.
The eco cotton cycle finishes faster compared to other dryers with the same load capacity.
You can control your dryer anytime and anywhere with an app on your phone.
Without a self-cleaning condenser, you need to clean the condenser yourself.
You won’t reduce wrinkles or freshen up musty laundry without a steam function.
679,-
679,-
Current product
679,-
800,-
649,-
849,-
If you purchase the Whirlpool C WD1 94M WBS BE and take out a new energy contract at Coolblue Energy, you'll receive a cashback up to € 300 from Coolblue. Go to the promotional Terms and Conditions (PDF) for more information.
Coolblue takes care of everything, from taking out an insurance to repairs
For almost all accidents
More coverage in case of damage than your standard warranty
No deductible
First, add your dryer to your shopping cart. On the next page, choose the Protection Plan below. You always have a 30-day return window and pay no deductible in case of damage.
4-year Protection Plan
93,-
one-time5-year Protection Plan
134,-
one-timeIn stock
In stock